Ocean Spray Culvert Improvement

Ocean Spray Culvert Improvement

A seemingly simple project can often have challenges that can make or break a budget. For Ocean Spray, a strict, two-week timeframe in which part of the project could be completed meant the difference between success and potentially costly back-ups in production. Ruekert & Mielke, Inc. (R/M) was the only firm to offer a schedule that fit within the timeframe and kept on budget.

New Berlin Eisenhower Parking Lot Improvements

New Berlin Eisenhower Parking Lot Improvements

The paved surfacing at the Eisenhower Middle/High School campus had reached the end of its useful life and needed to be replaced. Like most school districts, New Berlin did not have the funds to replace the 10 plus acres of pavement at one time. The School District of New Berlin hired Ruekert & Mielke, Inc. (R/M) to develop a plan to replace all paved surfacing over an extended period of time.

Thermo-Fischer Scientific Site Improvements

Thermo-Fischer Scientific Site Improvements

Ruekert & Mielke, Inc. (R/M) was selected as the design firm for the Thermo-Fisher (Thermo) Site Improvements project located on the south side of Fitchburg, WI. The site redevelopment included two new parking lots (13,000 S.F. and 11,000 S.F.), a delivery truck staging area, a new 1,500 L.F. truck access drive, resurfacing of the existing facility loop road, and a modular block retaining wall within the 20–acre Thermo-Fisher campus. In addition, the project also included the design of bioretention areas to satisfy local drainage and water quality requirements.

Site Development for UW Health East Side Campus

Site Development for UW Health East Side Campus

Ruekert & Mielke, Inc. (R/M) was selected as part of the design team for the new orthopedic hospital facility for the UW Hospital and Clinics located on the east side of Madison in The American Center.The project site is 41.50 acres in size and includes a 494,000 square foot building, central utility plant, loading dock, and parking ramp. The site also has approximately 1,100 parking stalls.