Viewing entries in
Project Experience

Utility Rehabilitation in the City of Franklin

Utility Rehabilitation in the City of Franklin

The City of Franklin had one subdivision that was experiencing unusually high peak to average sewer flows. A hundred homes were 1950’s vintage, the subdivision was rural cross section with ditches, and there were known homes with hung plumbing and possible cross connections. Learn how utility rehabilitation assisted in resolving this issue.

Village of Mukwonago Business Park

Village of Mukwonago Business Park

The Village of Mukwonago recently committed to building a new 115-acre business park in its thriving community. The key to the development of the business park was a clear understanding of its community-wide infrastructure systems and how that expanded infrastructure would fit within the community’s infrastructure puzzle.

City of Sheboygan: LED Lighting System for SouthPointe Enterprise Campus

City of Sheboygan: LED Lighting System for SouthPointe Enterprise Campus

Ruekert & Mielke, Inc. (R/M) provided the City of Sheboygan with electrical engineering services to layout and design an LED lighting system to serve their new SouthPointe Enterprise Campus. By going with an LED-based lighting system, the City will benefit through reduced energy consumption, lower maintenance, and longer-lasting fixtures.

Village of Pewaukee: Treating Groundwater to Remove Radium

Village of Pewaukee: Treating Groundwater to Remove Radium

Water pumped from the deep sandstone aquifer in Southeastern Wisconsin usually contains radium. This radionuclide occurs naturally. People drinking water containing a high concentration of radium are at increased risk of developing bone cancer.

Learn how R/M worked with the Village of Pewaukee to design an economical treatment system to remove radium from their groundwater.

City of Pewaukee Pavement Preservation

City of Pewaukee Pavement Preservation

Many municipalities face the problems of declining roadway infrastructure and limited funds to pay for repairs. Undertaking proper pavement maintenance at the appropriate time produces overall savings to the community. With limited funding for its road repair program, the City of Pewaukee used an innovative approach to resolve their roadway problems.

Private Development Review of The Glen of Mukwonago

Private Development Review of The Glen of Mukwonago

Just about every project has some sort of challenge. There are physical challenges such as, wetlands, endangered resources, environmental corridors, storm water planning, setbacks, topography, proximity to services (or lack thereof), and access. Then, there are financial challenges like supply and demand, changes in the economy, and over-extension. What makes this private development a great case study is that all these challenges were experienced.

City of Kenosha Storm Water Analysis

City of Kenosha Storm Water Analysis

As the City of Kenosha embarked on a comprehensive analysis of their storm water infrastructure from both flood control and water quality perspectives, the City was hit with back-to-back intense rainfall events in July of 2017 that resulted in significant local and regional flooding. The immediate public health and safety concerns tied to this flooding event doubled down the City’s efforts to simultaneously develop a long-term plan for the future, while also quickly addressing some of the most pressing concerns.

How Menomonee Falls Capitalized on Long-Range SCADA Planning

How Menomonee Falls Capitalized on Long-Range SCADA Planning

The Village of Menomonee Falls is the perfect example of how long-range planning can increase your SCADA system's reliability. Over the past 25 years, their ongoing system maintenance and regularly scheduled hardware and software upgrades have resulted in no significant failures. Read more to learn how they did it.

City of Peshtigo Smoke Testing Program

City of Peshtigo Smoke Testing Program

The City of Peshtigo has experienced recent sewer system overflow events that have been partly due to high wet weather flows.  R/M assisted in performing a smoke testing program as part of the City’s sewer system evaluation survey (SSES).

IMPACT FEE STUDY LEADS TO NEW FIRE STATION

IMPACT FEE STUDY LEADS TO NEW FIRE STATION

Development drove the need for the City of Oconomowoc to provide new municipal facilities. Impact fees helped them meet the need by providing facilities, such as Fire Station No. 2, to fuel development. 

Learn how Oconomowoc was able to fund facilities to attract development through working with R/M on an impact fee study.

Porous Asphalt Pavements: City of New Berlin

Porous Asphalt Pavements: City of New Berlin

The City of New Berlin was faced with a difficult design challenge for a 7-block section of alley in the Buena Park neighborhood. The City wanted to take advantage of a Green Solutions grant from the Milwaukee Metropolitan Sewerage District (MMSD). The solution was a porous asphalt pavement to provide storm water storage, filtration, and conveyance.

Village of Brown Deer Urban Forestry Grant Project

Village of Brown Deer Urban Forestry Grant Project

In the summer of 2016, the Village of Brown Deer contacted Ruekert & Mielke, Inc. (R/M) for assistance in developing an urban forestry project that would be strong enough to meet the application needs of the DNR's Urban Forestry Grant.   

SCADA System TLC: City of Pewaukee

SCADA System TLC: City of Pewaukee

The City of Pewaukee Water & Sewer Utility has been proactive recently in upgrading several components of their Supervisory Control and Data Acquisition (SCADA) System. By anticipating needs in advance, several smaller projects were able to be budgeted for and sequenced out over a several year period. 

South Milwaukee Football Field Review

South Milwaukee Football Field Review

The School District of South Milwaukee hired Ruekert & Mielke, Inc. (R/M) to review an ongoing drainage problem on their high school football field. The field became saturated when it rained and wet conditions made it difficult to maintain the natural grass causing field activities to be delayed or moved elsewhere. Learn how R/M helped them get back on the field.

Village of Fox Point GIS & MS4/TMDL

Village of Fox Point GIS & MS4/TMDL

The Village of Fox Point obtained an Urban Nonpoint Source Planning Grant from the Wisconsin DNR to update the Village's storm water management plan, emphasizing water quality modeling, updating ordinances, and evaluating Milwaukee River TMDL requirements. The Village selected Ruekert & Mielke, Inc. (R/M) in part due to their comprehensive storm water experience and capabilities in order to fully utilize the grant funding. 

Town of Waukesha Pavement Management

Town of Waukesha Pavement Management

Keeping up to date with municipal road ratings and pavement management requires both organization and experience. The Town of Waukesha has utilized the services of Ruekert & Mielke, Inc. (R/M) for their pavement management needs, recognizing R/M's tested approach to providing quality pavement management programs to communities in Wisconsin and Illinois.